AB 2533 ADU / JADU

Assembly Bill 2533

In accordance with AB 2533, a streamlined process is now available to help you permit your ADU or JADU that was constructed prior to January 1, 2020. This is an opportunity to ensure the dwelling unit is in compliance with the Health & Safety Code, while also enhancing its value.

To guide you through the steps please reference the following steps:

  1. Complete the application
  2. Complete the Substandard Housing Inspection Checklist (see inspection requirements below)
  3. Contact Planning Division to obtain and record the required covenant
  4. Pay the application fee and submit the completed application, substandard Housing Inspection Checklist, Proof that the unit was constructed/converted before January 1st, 2020 and Plans (Site plan, floor plan and photos)

To be eligible documentation will need to be submitted showing proof that the ADU or JADU was constructed/converted before January 1, 2020. The construction/conversion date may be established with one or more of the following forms of documentation:

  • The County Assessor’s initial date recognizing the unpermitted dwelling unit
  • Escrow documents identifying the unit and the year of construction
  • Prior official Building, Planning, or Code Enforcement records of the unit
  • Real estate transfer disclosure forms for unpermitted unit
  • Other documents will be considered on a case by case basis

Inspection Requirements

A Substandard Housing Inspection Checklist will need to be completed by either a California Licensed General Contractor (B License), a California Licensed Architect, or a California Licensed Engineer. If violation(s) are found plans will need to be submitted and permits pulled to correct the violation(s).

Note: Before submittal the homeowner may obtain a confidential third-party code inspection from a licensed contractor to determine the unit’s existing condition or potential scope of building improvements before submitting an application for a permit.

Related Documents